Home>Updates

  • Pressurizer at Tianwan Unit 6 installed

    2019.05.20

    The pressurizer for Tianwan Unit 6 has been successfully installed, according to a statement by CNNC on May 17.

  • Liu Jiazhi, a designer of China's first Hualong One nuclear project

    2019.05.20

    “Quality and safety are at the heart of design in any engineering project, so the designer should take responsibility for these aspects”, said Liu Jiazhi, a designer for China National Nuclear Corporation (CNNC).

  • CNNC promotes renewables in Hainan

    2019.05.20

    China National Nuclear Corporation (CNNC) will put all its resources into promoting the construction of the second phase of Changjiang Nuclear Power Plant in Hainan province, as required by the Implementation Plan for the National Ecological Civilization Pilot Zone (Hainan), recently launched by the national government.

  • Chinese nuclear companies sign deal with Ansaldo Energia

    2019.05.17

    CNNC Environmental Protection Co Ltd signed a memorandum of understanding with Shanghai Electric Nuclear Power Group and Italia’s Ansaldo Energia in Shanghai on May 16.

  • CNNC president meets SAP delegation

    2019.05.15

    Gu Jun, president of China National Nuclear Corporation (CNNC), met with a delegation led by Sam Li, managing director of SAP China, at CNNC’s headquarters on May 13.

  • CNNC capable of mass producing CF3 fuel assembly

    2019.05.12

    China National Nuclear Corporation (CNNC) is now capable of mass producing CF3 fuel assembly for the HPR1000, China’s third-generation nuclear power technology, according to an announcement on May 10.

< 1 ... 8 9 10 11 12 ... 51 >

Contact Us

No.1 Nansanxiang, Sanlihe, Beijing 100822, P.R. China

Tel: 86-10-68512211

Fax: 86-10-68533989

Please leave a message...

Your E-mail Adress

Copyright © China National Nuclear Corporation. All Rights Reserved.

Presented by China Daily. 京ICP备06041231号-1