Home>Updates

  • CNNC promotes use of artificial intelligence in nuclear industry

    2019.05.11

    China National Nuclear Corporation (CNNC) launched a project to employ artificial intelligence (AI) in the nuclear technology industry on May 9.

  • CNNC engineers nominated for CAE membership

    2019.05.02

    Two engineers at China National Nuclear Corporation (CNNC) have been nominated for membership in the Chinese Academy of Engineering (CAE), according to a list recently released by the academy.

  • Control room at Karachi power plant now operational

    2019.04.30

    The main control room of the Unit 2 of the Karachi nuclear power plant, China’s self-developed third-generation HPR1000 demonstration project in Pakistan, was declared operational on April 28, according to an announcement by China National Nuclear Corporation (CNNC).

  • Fuqing Unit 5’s heat exchangers installed

    2019.04.30

    All major equipment for the Fuqing Nuclear Power Plant, the world’s first HPR1000 reactor, has now been successfully hoisted.

  • Mongolian energy minister visits CNNC subsidiary

    2019.04.28

    Mongolian Energy Minister Tserenpil Davaasuren visited China Nuclear Engineering and Construction Corporation Limited (CNEC Corporation), a subsidiary of CNNC, on April 26 to discuss specifics on the construction of the Baganuur power station, which was funded and built by the company.

  • CNNC president meets Saudi Arabia’s energy minister

    2019.04.27

    CNNC President Gu Jun met with Khalid A. Al-Falih, Minister of Energy, Industry, and Mineral Resources of Saudi Arabia, on April 25.

< 1 ... 9 10 11 12 13 ... 51 >

Contact Us

No.1 Nansanxiang, Sanlihe, Beijing 100822, P.R. China

Tel: 86-10-68512211

Fax: 86-10-68533989

Please leave a message...

Your E-mail Adress

Copyright © China National Nuclear Corporation. All Rights Reserved.

Presented by China Daily. 京ICP备06041231号-1