-
CNNC promotes use of artificial intelligence in nuclear industry
2019.05.11China National Nuclear Corporation (CNNC) launched a project to employ artificial intelligence (AI) in the nuclear technology industry on May 9.
-
CNNC engineers nominated for CAE membership
2019.05.02Two engineers at China National Nuclear Corporation (CNNC) have been nominated for membership in the Chinese Academy of Engineering (CAE), according to a list recently released by the academy.
-
Control room at Karachi power plant now operational
2019.04.30The main control room of the Unit 2 of the Karachi nuclear power plant, China’s self-developed third-generation HPR1000 demonstration project in Pakistan, was declared operational on April 28, according to an announcement by China National Nuclear Corporation (CNNC).
-
Fuqing Unit 5’s heat exchangers installed
2019.04.30All major equipment for the Fuqing Nuclear Power Plant, the world’s first HPR1000 reactor, has now been successfully hoisted.
-
Mongolian energy minister visits CNNC subsidiary
2019.04.28Mongolian Energy Minister Tserenpil Davaasuren visited China Nuclear Engineering and Construction Corporation Limited (CNEC Corporation), a subsidiary of CNNC, on April 26 to discuss specifics on the construction of the Baganuur power station, which was funded and built by the company.
-
CNNC president meets Saudi Arabia’s energy minister
2019.04.27CNNC President Gu Jun met with Khalid A. Al-Falih, Minister of Energy, Industry, and Mineral Resources of Saudi Arabia, on April 25.