-
CNNC conducts mineral fieldwork in Saudi Arabia
2017.06.26The China National Nuclear Corporation (CNNC) completed a phase of fieldwork in Saudi Arabia, discovering and labeling several target mineral areas. Officials and experts from Saudi Arabia highly praised the breakthrough made by CNNC crew in mine exploration and exploitation.
-
Wang Shoujun visits Turkey to deepen energy cooperation
2017.06.16Invited by Cengiz Group, Wang Shoujun, chairman of China National Nuclear Corporation (CNNC), paid a visit to Turkey with a delegation from June 11 to 14, and met with Turkish President Recep Tayyip Erdogan and Minister of Energy and Natural Resources Berat Albayrak on June 13 in Ankara.
-
President Xi praises HPR 1000 in Astana
2017.06.12Chinese President Xi Jinping and Kazakh President Nursultan Nazarbayev visited China Pavilion before the opening ceremony of the 2017 Astana Expo on June 8, during which CNNC’s Chairman Wang Shoujun introduced the HPR 1000 to officials.
-
CNNC loads low-enriched uranium fuel for Ghana MNSR
2017.06.02The China National Nuclear Corporation (CNNC) completed a domestic preliminary task for Ghana’s uranium low-enrichment project in miniature neutron source reactor (MNSR) on May 27.
-
HPR1000’s first global reactor demo project completes dome lifting
2017.05.26Fuqing Unit 5, the first global reactor demo project of CNNC’s HPR1000, completed dome lifting on May 25, 15 days ahead of schedule, and entered the equipment installation phase.
-
CNNC to build heavy water reactor and HPR 1000 units in Argentina
2017.05.19Wang Shoujun, chairman of China National Nuclear Corporation (CNNC), and Omar Semmoloni, chairman of Argentina's nuclear power giant Nucleoeléctrica Argentina S.A (NASA), signed a contract concerning Argentina's fourth and fifth nuclear power plants in the presence of Chinese President Xi Jinping and Argentina's President Mauricio Marcri at the Great Hall of the People in Beijing on May 17.