Home>Updates

  • Fuqing Unit 5 internal structure completed

    2017.05.10

    The internal structural construction of reactor buildings in Unit 5 of the Fuqing Nuclear Power Plant (NPP), the first HPR 1000 demonstration project, was completed on May 3. It’s favorable to later dome lifting and fixing alongside core equipment installation in Unit 5.

  • CNNC entitled official partner of China Pavilion at Astana Expo 

    2017.05.04

    China National Nuclear Corporation (CNNC) was honored as the official partner of the China Pavilion at the 2017 Astana Exposition during an awards ceremony held in Beijing on April 28.

  • CNNC signs agreement with Iran on IR-40 retrofit

    2017.04.26

    China Nuclear Energy Industry Corporation and China Institute of Atomic Energy, two subsidiaries of China National Nuclear Corporation (CNNC), signed the first commercial contract with Iran Nuclear Engineering and Construction Company on the retrofit project of Arak heavy water reactor (IR-40) in Vienna, Austria on April 23. The ceremony took place in the presence of the ambassadors of China and Iran to Austria.

  • CNNC masters HPR 1000 core devices 

    2017.04.21

    ​As HPR 1000 demonstrative project—Unit 5 of Fujian province’s Fuqing Nuclear Power Plant completed its hydraulic pressure tests on April 8, all tests for the first Chinese-made third-generation reactor pressure vessel had been completed.

  • CNNC loads medical cobalt-60 into reactors 

    2017.04.21

    China's first batch of medical cobalt-60 was loaded into nuclear reactors managed by China National Nuclear Corporation (CNNC) on April 15, and the medical cobalt-60 products are expected to be launched to the market in 2019.

  • CNNC organizes nuclear seminars for Arab countries 

    2017.04.20

    ​Seminars centralized on training decision-makers from nuclear institutes in Arab countries were organized by China’s Ministry of Commerce and China Zhongyuan Engineering Company, a subsidiary of China National Nuclear Corporation (CNNC), in Beijing on April 12.

< 1 ... 30 31 32 33 34 ... 51 >

Contact Us

No.1 Nansanxiang, Sanlihe, Beijing 100822, P.R. China

Tel: 86-10-68512211

Fax: 86-10-68533989

Please leave a message...

Your E-mail Adress

Copyright © China National Nuclear Corporation. All Rights Reserved.

Presented by China Daily. 京ICP备06041231号-1