Tianwan Unit 3 joins power grid

webwxgetmsgimg.jpg

Unit 3 of Tianwan Nuclear Power Plant succeeded in connecting to the power grid in Lianyungang, Jiangsu province on Dec 30, with all technical indicators according with initial design requirements.

It lays a solid ground to guarantee the unit to enter commercial operation on schedule. At this point, CNNC runs 18 nuclear power units with a total installed capacity of more than 15 gigawatts, which will contribute to the improvement of energy structure, ecological protection and a beautiful country.


Contact Us

No.1 Nansanxiang, Sanlihe, Beijing 100822, P.R. China

Tel: 86-10-68512211

Fax: 86-10-68533989

Please leave a message...

Your E-mail Adress

Copyright © China National Nuclear Corporation. All Rights Reserved.

Presented by China Daily. 京ICP备06041231号-1