CNNC’s two new nuclear units approved in Fujian

CNNC’s new nuclear power project in Zhangzhou city, Southeast China’s Fujian province, was authorized by the National Energy Administration, according to an announcement by China National Nuclear Power Co, a subsidiary of CNNC, on July 26.

The project consists of the construction of two HPR1000 (Hualong 1) units, which will be funded, built, and operated by CNNP Guodian Zhangzhou Energy Co, a holding company of China National Nuclear Power Co.

The Hualong 1 is an example of China’s self-developed third-generation nuclear technology. The reactor has a double containment design, enabling it to withstand an aircraft collision.

The four HPR1000 units being built by CNNC are the world’s only third-generation pressurized water reactor nuclear power projects to be built according to schedule. Currently, all parts of the HPR1000 project, both in China and abroad, have been completed on or ahead of schedule, and have all maintained high quality and safety standards.

 

 

 


Contact Us

No.1 Nansanxiang, Sanlihe, Beijing 100822, P.R. China

Tel: 86-10-68512211

Fax: 86-10-68533989

Please leave a message...

Your E-mail Adress

Copyright © China National Nuclear Corporation. All Rights Reserved.

Presented by China Daily. 京ICP备06041231号-1