CNNC's National No 1 Uranium demonstration project is China's largest modern natural uranium production base, built to the highest standards and equipped with the most advanced technological systems.
Mining without conventional excavation

The project adopts an innovative green uranium extraction method known as CO2 + O2 in-situ leaching, transforming the traditional underground mining model. The leaching solution is injected through boreholes to dissolve uranium underground, then pumped back to the hydrometallurgical plant through a sealed pipeline network, forming a fully enclosed underground circulation system.
The solution is recycled for reuse, while the hydrometallurgical plant operates with fully automated and intelligent systems. The process achieves zero emissions, minimal ecological disturbance, and low-carbon, sustainable operations.

Turning the Gobi into a "Resource Treasure Trove"

Through a series of technological innovations, the project significantly improves uranium recovery rates, unlocking extensive uranium reserves in the northern basins that were previously uneconomical to develop. It also helps establish a domestic production structure centered on sandstone-hosted uranium deposits, supplemented by hard-rock uranium deposits.
Once fully operational, the National No 1 Uranium is expected to provide a stable and reliable domestic nuclear fuel supply, strengthen the self-reliance of China's nuclear fuel industry chain, and reinforce the country's nuclear energy security.