Video meeting held between CNNC and HE on HPR1000 project main pump supply
Qian Zhimin, China National Nuclear Corporation (CNNC) president, and Zou Lei, Harbin Electric Corp (HE) president, held a video meeting on the HPR1000 project on May 9. They exchanged views on the supply of HPR1000’s main pump and other matters. The two parties agreed that the status of construction and project development generally was satisfactory, and on this basis Qian urged all personnel to carry on accomplishing the supply task.
As a key piece of equipment for the nuclear plant, the HPR1000 main pump is paid special attention by CNNC, which has set up a special team to conduct regular high-level coordination and quick response to ensure an on-time supply.
- China Institute of Atomic Energy
- Nuclear Power Institute of China
- Southwestern Institute of Physics
- China Nuclear Power Operation Technology Corporation, Ltd.
- China Nuclear Power Engineering Co., Ltd.
- China Institute for Radiation Protection
- Beijing Research Institute of Uranium Geology (BRIUG)
- China Institute of Nuclear Industry Strategy (CINIS)
- China Nuclear Mining Science and Technology Corporation